This paper presents the analysis of the data gathered from the interview survey revealing the process of road constructions project, cost of labour and other important factors which can result in high cost construction. These motorway categories can employ a large variety of structural materials and can be constructed to develop a great number of structural types. Over fifty contractors were contacted and asked for an interview survey. A total of 29 responded to participate in the interview surveys. The main objective of this paper is to present the current status on the causes of overruns in Kosovo in highway and road projects, information can be very useful for Ministry of Infrastructure , to find main problems and gaps in road constructions projects. Review and of questionnaires and personal contact have been focused on completed projects from the Ministry of infrastructure to determine the types of delays that have caused cost and time overruns. The information regarding the delay in construction was collected from the respondents which include various factors that directly or indirectly affected on the construction plans. There are two types of factors; economic factors and other factors, which influences the construction delay of roads and highway in Kosovo. However, economic factor is the most important factor that contains many control variables which directly or indirectly has an influence on the quick or delayed construction of roads and highway in Kosovo.
Keywords:
roads and highway, Kosovo, Ministry of infrastructure
Proceedings Editor
Edmond Hajrizi & Mo Vaziri
First Page
220
Location
Prishtina, Kosovo
Start Date
2-11-2012 9:00 AM
End Date
3-11-2012 5:00 PM
DOI
10.33107/ubt-ic.2012.22
Recommended Citation
Ahmeti, Muhamet, "Current status on the causes of overruns deadline in Kosovo in highway and road constructions projects" (2012). UBT International Conference. 22.
https://knowledgecenter.ubt-uni.net/conference/2012/all-events/22
Included in
Current status on the causes of overruns deadline in Kosovo in highway and road constructions projects
Prishtina, Kosovo
This paper presents the analysis of the data gathered from the interview survey revealing the process of road constructions project, cost of labour and other important factors which can result in high cost construction. These motorway categories can employ a large variety of structural materials and can be constructed to develop a great number of structural types. Over fifty contractors were contacted and asked for an interview survey. A total of 29 responded to participate in the interview surveys. The main objective of this paper is to present the current status on the causes of overruns in Kosovo in highway and road projects, information can be very useful for Ministry of Infrastructure , to find main problems and gaps in road constructions projects. Review and of questionnaires and personal contact have been focused on completed projects from the Ministry of infrastructure to determine the types of delays that have caused cost and time overruns. The information regarding the delay in construction was collected from the respondents which include various factors that directly or indirectly affected on the construction plans. There are two types of factors; economic factors and other factors, which influences the construction delay of roads and highway in Kosovo. However, economic factor is the most important factor that contains many control variables which directly or indirectly has an influence on the quick or delayed construction of roads and highway in Kosovo.