Source Protection: Environment Impact of Waste Water Treatment Plant at Mramor – Badovc Lake

Session

Civil Engineering, Infrastructure and Environment

Description

From 2010 Government of Kosovo, finalized regulations and rules regarding water zone protection. In this regard Regional Water Company Pristina made some steps towards these goals, in order to protect own sources. During 2010 company invested in a design for protection zones and based on this there were construction of RC retaining walls – barrier, towards the road at Lake, Screens at the discharge point from the streams, and finally in 2015-2017 construction of Waste Water Treatment Plant (WWTP) at Mramori. WWTP was constructed on 2016, finalized with sewage network on 2017, under operation and based on results from the samples taken at the inlet and outlet of the Plant we made calculations on Environmental Impact as well cost savings O&M, methodology is based on an assessment towards main parameters.

Keywords:

BOD, TOC, Protection, and Water Quality

Session Chair

Izet Ibrahimi

Session Co-Chair

Bekim Selimi

Proceedings Editor

Edmond Hajrizi

ISBN

978-9951-437-54-7

Location

Durres, Albania

Start Date

29-10-2017 9:00 AM

End Date

29-10-2017 10:30 AM

DOI

10.33107/ubt-ic.2017.75

This document is currently not available here.

Share

COinS
 
Oct 29th, 9:00 AM Oct 29th, 10:30 AM

Source Protection: Environment Impact of Waste Water Treatment Plant at Mramor – Badovc Lake

Durres, Albania

From 2010 Government of Kosovo, finalized regulations and rules regarding water zone protection. In this regard Regional Water Company Pristina made some steps towards these goals, in order to protect own sources. During 2010 company invested in a design for protection zones and based on this there were construction of RC retaining walls – barrier, towards the road at Lake, Screens at the discharge point from the streams, and finally in 2015-2017 construction of Waste Water Treatment Plant (WWTP) at Mramori. WWTP was constructed on 2016, finalized with sewage network on 2017, under operation and based on results from the samples taken at the inlet and outlet of the Plant we made calculations on Environmental Impact as well cost savings O&M, methodology is based on an assessment towards main parameters.