Source Protection: Environment Impact of Waste Water Treatment Plant at Mramor – Badovc Lake
Session
Civil Engineering, Infrastructure and Environment
Description
From 2010 Government of Kosovo, finalized regulations and rules regarding water zone protection. In this regard Regional Water Company Pristina made some steps towards these goals, in order to protect own sources. During 2010 company invested in a design for protection zones and based on this there were construction of RC retaining walls – barrier, towards the road at Lake, Screens at the discharge point from the streams, and finally in 2015-2017 construction of Waste Water Treatment Plant (WWTP) at Mramori. WWTP was constructed on 2016, finalized with sewage network on 2017, under operation and based on results from the samples taken at the inlet and outlet of the Plant we made calculations on Environmental Impact as well cost savings O&M, methodology is based on an assessment towards main parameters.
Keywords:
BOD, TOC, Protection, and Water Quality
Session Chair
Izet Ibrahimi
Session Co-Chair
Bekim Selimi
Proceedings Editor
Edmond Hajrizi
ISBN
978-9951-437-54-7
Location
Durres, Albania
Start Date
29-10-2017 9:00 AM
End Date
29-10-2017 10:30 AM
DOI
10.33107/ubt-ic.2017.75
Recommended Citation
Xhafa, Sokol; Abdullahu, Ilir; Okcu, Davut; Spahiu, Sabrie; and Kosumi, Ninez, "Source Protection: Environment Impact of Waste Water Treatment Plant at Mramor – Badovc Lake" (2017). UBT International Conference. 75.
https://knowledgecenter.ubt-uni.net/conference/2017/all-events/75
Source Protection: Environment Impact of Waste Water Treatment Plant at Mramor – Badovc Lake
Durres, Albania
From 2010 Government of Kosovo, finalized regulations and rules regarding water zone protection. In this regard Regional Water Company Pristina made some steps towards these goals, in order to protect own sources. During 2010 company invested in a design for protection zones and based on this there were construction of RC retaining walls – barrier, towards the road at Lake, Screens at the discharge point from the streams, and finally in 2015-2017 construction of Waste Water Treatment Plant (WWTP) at Mramori. WWTP was constructed on 2016, finalized with sewage network on 2017, under operation and based on results from the samples taken at the inlet and outlet of the Plant we made calculations on Environmental Impact as well cost savings O&M, methodology is based on an assessment towards main parameters.