Analysis of loads during the summer-winter season in Substation (SS) 35/10 kV Gjilani I

Session

Energy Efficiency Engineering

Description

In any country, the increase in population in terms of energy affects the increase in the demand for electricity consumption. The existing electric power grid cannot withstand this growth if it is not invested proportionally. The expansion of this network also means an increase in the likelihood of the appearance of various defects in it. Such faults mean overloads, short connections in the network, etc. But what we come up against is the change in supply over time. Due to the busy network, problems arise during the supply periods. In this paper, the main focus falls on the analysis of the loads during the summer-winter season, especially during the winter, at the 35/10 kV Gjilani I Substation. This substation receives its 35 kV supply from the 110/35/10 kV Gjilani 1 Substation. , for this reason the analysis of the load flow in the entire district of Gjilan was done by this substation through the advanced SCADA system (System for Remote Control of the Power Network) during the normal summer season, when the loads are below the nominal operating values and during the season winter, when the loads reach the maximum values in the system, which also cause major problems/defects. Such problems are also present at the Low Voltage level of 0.4 kV, but in the case of affecting the Medium Voltage, the Low Voltage is definitely affected as well. . For this reason, the focus in this project will be on the analysis of the load at the Medium Voltage level, without neglecting the damage caused to other devices of the Distribution System (on the transformed side of the voltage).

Keywords:

Substation, load, faults, SCADA, distribution system, Remote control system, power system.

Proceedings Editor

Edmond Hajrizi

ISBN

978-9951-550-50-5

Location

UBT Kampus, Lipjan

Start Date

29-10-2022 12:00 AM

End Date

30-10-2022 12:00 AM

DOI

10.33107/ubt-ic.2022.123

This document is currently not available here.

Share

COinS
 
Oct 29th, 12:00 AM Oct 30th, 12:00 AM

Analysis of loads during the summer-winter season in Substation (SS) 35/10 kV Gjilani I

UBT Kampus, Lipjan

In any country, the increase in population in terms of energy affects the increase in the demand for electricity consumption. The existing electric power grid cannot withstand this growth if it is not invested proportionally. The expansion of this network also means an increase in the likelihood of the appearance of various defects in it. Such faults mean overloads, short connections in the network, etc. But what we come up against is the change in supply over time. Due to the busy network, problems arise during the supply periods. In this paper, the main focus falls on the analysis of the loads during the summer-winter season, especially during the winter, at the 35/10 kV Gjilani I Substation. This substation receives its 35 kV supply from the 110/35/10 kV Gjilani 1 Substation. , for this reason the analysis of the load flow in the entire district of Gjilan was done by this substation through the advanced SCADA system (System for Remote Control of the Power Network) during the normal summer season, when the loads are below the nominal operating values and during the season winter, when the loads reach the maximum values in the system, which also cause major problems/defects. Such problems are also present at the Low Voltage level of 0.4 kV, but in the case of affecting the Medium Voltage, the Low Voltage is definitely affected as well. . For this reason, the focus in this project will be on the analysis of the load at the Medium Voltage level, without neglecting the damage caused to other devices of the Distribution System (on the transformed side of the voltage).