Compressive Strength, Clay Bricks, Mortar, Waste Management, Pozzolan

Session

Civil Engineering, Infrastructure and Environment

Description

Road works, especially in the reconstruction of roads and bridges, present a high level of risk if preventive measures are not taken before the execution of the project. The road safety project, before the execution of the works, it is very necessary to audit the safety elements in order to prevent accidents in the road section of vehicle traffic. In our case, the diversion of the road due to the construction of the bridge in the direction of Pristina-Gjilan at Lake Badovci was done by the audit of the signaling project and it turned out that the signaling is not in compliance with the signaling standard, so the level of danger on the road is high.

Keywords:

Road auditing, Traffic signaling, Road safety

Proceedings Editor

Edmond Hajrizi

ISBN

978-9951-982-15-3

Location

UBT Kampus, Lipjan

Start Date

25-10-2024 9:00 AM

End Date

27-10-2024 6:00 PM

DOI

10.33107/ubt-ic.2024.334

This document is currently not available here.

Share

COinS
 
Oct 25th, 9:00 AM Oct 27th, 6:00 PM

Compressive Strength, Clay Bricks, Mortar, Waste Management, Pozzolan

UBT Kampus, Lipjan

Road works, especially in the reconstruction of roads and bridges, present a high level of risk if preventive measures are not taken before the execution of the project. The road safety project, before the execution of the works, it is very necessary to audit the safety elements in order to prevent accidents in the road section of vehicle traffic. In our case, the diversion of the road due to the construction of the bridge in the direction of Pristina-Gjilan at Lake Badovci was done by the audit of the signaling project and it turned out that the signaling is not in compliance with the signaling standard, so the level of danger on the road is high.