Date of Award
Fall 10-2011
Document Type
Thesis
Degree Name
Master of Architecture (MArch)
Department
Architecture and Spatial Planning
First Advisor
Binak Beqaj
Language
English
Abstract
This master thesis study is performed with two main goals in mind. First goal is management of construction contract works and second implementation of construction works.
Contract of construction works has been subjected and given too much attention recent years. Because the contract conditions of construction projects has direct effects on project implementation.
Researched subject on this master thesis is one of big investment project in public enterprise company “Pristine International Airport”.
Project name “Resurfacing of Pristine International Runway, Taxiways and Apron”
Project contract is based on guidelines set by International Federation of Consulting Company.
The structure of this thesis is consistent with determined objectives and it is divided into 5 parts. Part 1 introduces general information of construction industry in Kosova second part: described project needs analysis, third part: managerial concept of the project, fourth part: project description and the last part is conclusion of master thesis study.
This master thesis was completed through my educational background and professional experience.
DOI
10.33107/ubt-etd.2011.959
Recommended Citation
Rexhepi, Vlora, "IMPACT OF CONTRAT CONDITIONS ON CONSTRUCTION PROJECTS" (2011). Theses and Dissertations. 1089.
https://knowledgecenter.ubt-uni.net/etd/1089