Importance of implementing digitalization of procedures for equipment with construction permits
Session
Architecture and Spatial Planning
Description
One of the challenges in construction field in Republic of Kosovo remains the digitalization of procedures for obtaining construction permits. The Municipality of Prishtina in cooperation with University for Business and Technology- UBT has realized for the first time the digitalization of the procedure of the equipment of the first phase of the construction permit, respectively equipment with Construction Conditions. This research aims to show benefits of switching from the current method of equipment with construction conditions to new digital process, 2018 statistics of equipment deadlines, until 2019, shortening procedures in case of implementation of digitalization of the procedure, the benefit of this method and the way of awareness of citizens for using the application through the online system.
Keywords:
permit, procedures, digitalization, municipality
Session Chair
Lulzim Beqiri
Session Co-Chair
Mimoza Sylejmani
Proceedings Editor
Edmond Hajrizi
ISBN
978-9951-437-96-7
Location
Lipjan, Kosovo
Start Date
31-10-2020 9:00 AM
End Date
31-10-2020 10:30 AM
DOI
10.33107/ubt-ic.2020.44
Recommended Citation
Rexhepi, Zejnulla; Veliu, Safete; and Beqiri, Lulzim, "Importance of implementing digitalization of procedures for equipment with construction permits" (2020). UBT International Conference. 372.
https://knowledgecenter.ubt-uni.net/conference/2020/all_events/372
Importance of implementing digitalization of procedures for equipment with construction permits
Lipjan, Kosovo
One of the challenges in construction field in Republic of Kosovo remains the digitalization of procedures for obtaining construction permits. The Municipality of Prishtina in cooperation with University for Business and Technology- UBT has realized for the first time the digitalization of the procedure of the equipment of the first phase of the construction permit, respectively equipment with Construction Conditions. This research aims to show benefits of switching from the current method of equipment with construction conditions to new digital process, 2018 statistics of equipment deadlines, until 2019, shortening procedures in case of implementation of digitalization of the procedure, the benefit of this method and the way of awareness of citizens for using the application through the online system.