Session

Energy Efficiency Engineering

Description

This project-oriented work, is a pre-feasibility study of a pico-hydraulics plant, which has to be installed on an appropriate structure in UBTUniversity for Business and Technology at Pristina, the capital of Kosovo. It begins with the structural analysis of the designed laboratory, moving on through to the technical-economic study of the individual components, concluding with the definition of its effectiveness, based on the actual data of the plant. The purpose of the plant comes from the idea of fully exploiting the energy available in a public building, with special regard to what is daily discarded without being exploited. It will be analyzed the feasibility and the convenience of the recovery of the grey water potential energy from buildings of considerable height (100 – 200 meters) through a hydraulic turbine.

Keywords:

Energy Efficiency, Pico Hydraulics, Green Energy, Architecture and Design, Reduction of Carbon Dioxide Emissions, Water Consumption Management.

Session Chair

Ines Bula

Session Co-Chair

Nafije Shabani

Proceedings Editor

Edmond Hajrizi

ISBN

978-9951-550-19-2

First Page

24

Last Page

34

Location

Pristina, Kosovo

Start Date

26-10-2019 1:30 PM

End Date

26-10-2019 3:00 PM

DOI

10.33107/ubt-ic.2019.156

Included in

Engineering Commons

Share

COinS
 
Oct 26th, 1:30 PM Oct 26th, 3:00 PM

Project Proposal for the Picoidraulica Laboratory

Pristina, Kosovo

This project-oriented work, is a pre-feasibility study of a pico-hydraulics plant, which has to be installed on an appropriate structure in UBTUniversity for Business and Technology at Pristina, the capital of Kosovo. It begins with the structural analysis of the designed laboratory, moving on through to the technical-economic study of the individual components, concluding with the definition of its effectiveness, based on the actual data of the plant. The purpose of the plant comes from the idea of fully exploiting the energy available in a public building, with special regard to what is daily discarded without being exploited. It will be analyzed the feasibility and the convenience of the recovery of the grey water potential energy from buildings of considerable height (100 – 200 meters) through a hydraulic turbine.